INFRASTRUCTURE

  • Electricity

    • Number of substations: 35

    • Total capacity: 7.9115 million KVA or above

  • Water supply

    • There are Licheng water factory, Xintang water factory, Xinhe water factory and many other water factories, with the daily water supply capacity of 740,000 tons

  • Gas supply

    • The total annual gas supply reaches 200,000 cubic meters, and the steam load reaches 590 tons/hour

  • Pollution discharge

    • Sewage treatment factory: 6

      Daily treatment Sewage Scale: 380,000 tons

      urban domestic sewage treatment rate reached 92%

  • Communication

    • As one of the key cities of national

      telecommunication and the three major Internet export hubs, it is the Wireless City demonstration area that Guangzhou makes great efforts to build

  • Port

    • The annual throughput capacity of Xin Tang Port is 1.5 million tons