Electricity
Number of substations: 35
Total capacity: 7.9115 million KVA or above
Water supply
There are Licheng water factory, Xintang water factory, Xinhe water factory and many other water factories, with the daily water supply capacity of 740,000 tons
Gas supply
The total annual gas supply reaches 200,000 cubic meters, and the steam load reaches 590 tons/hour
Pollution discharge
Sewage treatment factory: 6
Daily treatment Sewage Scale: 380,000 tons
urban domestic sewage treatment rate reached 92%
Communication
As one of the key cities of national
telecommunication and the three major Internet export hubs, it is the Wireless City demonstration area that Guangzhou makes great efforts to build
Port
The annual throughput capacity of Xin Tang Port is 1.5 million tons